Masar-Fintechمسار

AUD-E28 · Stage 3: Advanced

Application controls, interfaces and system reports

ع

رقابة التطبيقات والواجهات والتقارير المستخرجة

What you will be able to do

Test configured controls, interface completeness and the reliability of reports used in controls.

Open this lesson for free

Create a free account or sign in to see the situation, the concepts, the videos, the template and the quiz.

Create a free accountSign in

Watch first

Recommended, not required: this lesson is open now.